Phone icon334-245-8580
commercial building with new roof replacement

8 Step Guide to a Commercial Roof Replacement (+ Timeline)

Managing a commercial property involves juggling multiple responsibilities, one of the most significant being the maintenance and replacement of the roof. A well-maintained roof not only ensures the security and comfort of the building’s occupants but also plays a critical role in energy efficiency and property value.

Our guide aims to provide you, the property manager, with essential insights into commercial roof replacement, educating you on:

  • When to get a commercial roof replacement
  • Steps in the process
  • How long it will take

Signs You Need a Commercial Roof Replacement

aerial view of commercial roofs in alabama

Detecting early signs that warrant a roof replacement can save considerable time, hassle, and money. Here are some critical indicators that your commercial roof may be nearing the end of its lifespan:

  • Age of the Roof: Most commercial roofs are designed to last between 20 to 30 years. If your roof is approaching or has surpassed this age, it might be time to consider a replacement, even if there are no visible issues presently.
  • Frequent Repairs: When roof repairs become a regular necessity, it might be more cost-effective to invest in a replacement instead of sinking money into ongoing fixes.
  • Visible Damage: Look for visible signs of damage such as ponding water, missing or damaged shingles, cracks, or blisters. These can be signals of severe underlying issues.
  • Rising Energy Bills: An inefficient roof might not be adequately insulating the building, leading to higher heating and cooling costs. This is a significant sign that replacement should be considered.
  • Leaks and Water Damage: Leaks can sometimes be minimized with repairs, but if they persist or are widespread, a replacement might be the only effective solution.

Understanding the Cost of Commercial Roof Replacement

The cost of replacing a commercial roof can vary significantly based on several factors, with estimates generally ranging from $5 to $10 per square foot. Here’s what affects these costs:

  • Roof Size: Naturally, the size of your roof will affect the overall cost. Larger roofs will require more materials and labor.
  • Material Choice: Different roofing materials come with different price tags. For example, TPO and EPDM are typically less expensive, whereas metal roofing can be more costly.
  • Roof Accessibility: If additional equipment or labor is required to access the roof, this can increase costs.
  • Existing Roof Condition: Complexities involved in tearing down the existing roof, such as multiple layers or underlying damage, can elevate expenses.
  • Location and Labor Costs: Finally, geographic location can also influence the cost of labor and materials, affecting the total price.

Choosing the Right Material for Your Commercial Roof

Selecting the appropriate material for your commercial roof is essential for longevity, performance, and cost-efficiency. Below are some popular options to consider:

TPO (Thermoplastic Olefin)

aerial view of commercial roof replacement with tpo roofing materials
  • Pros: Cost-effective, reflective, and energy-efficient
  • Cons: Can be prone to punctures and degradation with time

EPDM (Ethylene Propylene Diene Monomer)

  • Pros: Durable and weather-resistant, easily repaired
  • Cons: Not as aesthetically pleasing as other options

Metal

  • Pros: Extremely durable, with longevity often surpassing 50 years
  • Cons: Higher upfront cost, potential for noise

Modified Bitumen

  • Pros: Durable and resistant to inclement weather
  • Cons: Can be susceptible to pooling water issues

Built-Up Roofing (BUR)

  • Pros: Ideal for flat roofs, provides excellent waterproofing
  • Cons: Heavy, which may require structural adjustments

When choosing a material, weigh the pros and cons based on your specific building needs and location.

8 Steps in the Commercial Roof Replacement Process

Understanding the commercial roof replacement process will help you manage expectations and plan accordingly. Here’s a general overview of the steps involved:

1. Initial Inspection and Assessment

A thorough inspection provides insights into the current roof condition and helps determine whether a replacement is necessary. This assessment will guide you in selecting the most suitable materials.

2. Selecting a Contractor

two roofing contractors work on installing a new commercial roof with metal roofing materials

Choose a qualified and reliable roofing contractor. Check for credentials, client feedback, and references. A reputable contractor will be transparent about pricing and timelines.

3. Choosing Roofing Materials

Based on your assessment, weigh the different materials’ pros and cons to choose the most suitable one.

4. Preparing the Site

Before the replacement begins, ensure the surrounding area is clear and safe. This minimizes the possibility of accidents during construction.

5. Removing Old Roofing Materials

The existing roof is thoroughly removed, permitting inspection of the underlying structure and repairing any damages.

6. Installing New Roofing System

The new roofing material is installed following industry standards and manufacturer guidelines, ensuring insulation and water resistance.

7. Final Inspections

After installation, the roof will be inspected again to verify that it meets quality and safety standards.

8. Maintenance Plan and Warranty

Discuss a maintenance plan with the contractor to prolong the life of the new roof. Ensure you have a clear understanding of the warranty terms.

What to Look for in a Commercial Roof Replacement

Flat roof replacement in montgomery al

Finally, when considering a commercial roof replacement, keep these critical aspects in mind:

  • Quality of Materials: Opt for high-quality materials that will withstand the local climate and provide long-term durability.
  • Experienced Contractors: Ensure the contractor has extensive experience with commercial roof replacements. This ensures a high standard of workmanship.
  • Warranty and Aftercare: Understand the warranty details and aftercare services provided. This makes sure that you’re covered in case of any issues post-installation.
  • Energy Efficiency: Choose materials and designs that maximize energy efficiency, potentially lowering operational costs in the long run.
  • Compliance with Regulations: Make sure the replacement complies with all necessary building codes and safety regulations.
  • Environmental Impact: Consider environmentally friendly options that can reduce your building’s carbon footprint.

Timeline for a Commercial Roof Replacement

Understanding the timeline of a commercial roof replacement can help you plan efficiently and minimize disruptions to your business operations. Here’s a general breakdown of the timeline you can expect:

Initial Consultation and Planning (1-2 weeks)

The process begins with a comprehensive consultation to assess your specific needs and constraints. During this phase, you will discuss your goals, budget, and material preferences with potential contractors. A detailed plan is then formulated.

Site Assessment and Measurements (1 week)

A professional roofing contractor will conduct a site assessment to take precise measurements and evaluate the existing roof’s condition. This step is crucial for accurate cost estimation and project scheduling.

Contract Finalization and Permits (1-2 weeks)

Once the details are finalized, the contract is executed. The contractor will then handle any necessary permits from local authorities, ensuring compliance with all regulations before the work begins.

Preparation and Mobilization (1 week)

In this phase, logistics are organized, and materials and equipment are delivered to the site. The area around the building is prepared to ensure a safe working environment.

Roof Replacement (2-3 weeks)

The old roofing materials are removed, and the new system is installed. The timeline for this phase can vary based on the roof size, the material chosen, and weather conditions.

Post-Installation Inspections and Clean-Up (1 week)

The final step involves a thorough inspection to guarantee that the installation meets all quality and safety standards. A clean-up is performed to ensure the property is left in good condition.

Total Estimated Timeline: 6-10 weeks

Keep in mind that these timeframes are approximate and may vary based on the complexity of the project, weather conditions, and contractor availability. Work closely with your chosen contractor to obtain a more accurate timeline tailored to your specific project.

Preparing for a Better, Longer-Lasting Roof

Taking the time to understand commercial roof replacement—from recognizing warning signs to selecting materials and contractors—ensures you make cost-effective, sustainable decisions for your property. Your roof is a long-term investment in your building’s health, so prioritize quality and maintain a regular upkeep routine.

Your rooftop protects your property, your tenants, and your peace of mind. By investing the necessary attention and resources now, you can ensure stability, safety, and satisfaction for years to come.

Contact our team at I Am Roofing today to learn all about our roofing systems for commercial buildings. 

Instant Quote

Share to...